| Token | Domain | Requirement | Floor | Held |
Result | Criticality · source |
| D06.04.S1 #V | Skill | Formulate & analyse a structural problem where information is incomplete; state assumptions and safety implications | Silver | Gold | MET | Critical · BS EN 1990; IStructE |
| D06.04.S2 #V | Skill | Direct and check the structural work of others; own the checking regime | Gold | Gold | MET | Critical · CDM 2015; IStructE |
| D06.04.S3 #V | Skill | Detect an unconservative assumption in a design check | Silver | Silver | MET | High · BS EN 1990 cl.6 |
| D06.04.S4 #V | Skill | Produce a verifiable structural calculation package | Silver | Silver | MET | High · BS EN 1990 Annex; CROSS-UK |
| D06.04.K1 #V | Knowledge | Structural actions and load paths (Eurocodes, permanent & transient) | Bronze | Silver | MET | High · BS EN 1990/1991 |
| D06.04.K2 #V | Knowledge | Disproportionate collapse and robustness classes | Silver | Silver | MET | Critical · Building Regs Sch.1 A3; BS EN 1991-1-7 |
| D06.04.K3 #V | Knowledge | CDM 2015 designer duties (reg.9 hierarchy of control) | Bronze | Bronze | MET | High · CDM 2015 reg.9 |
| D06.04.E1 #V | Experience | Engineer-of-record on a completed structural frame | Silver | Silver | MET | High · ISE professional review |
| D06.04.E2 #V | Experience | Breadth of experience including a higher-risk building (HRB) | Silver | Bronze | BELOW | High · BSA 2022 s.31 |
| D06.04.B1 #V | Behaviour | Raise a safety concern through CROSS / the duty to report | Gold | Gold | MET | Critical · BSA 2022 s.38; CROSS-UK |
| D06.04.B2 #V | Behaviour | Challenge a client/contractor decision that raises risk | Silver | Gold | MET | High · BS 8670:2024 |
| D06.04.A1 #V | Awareness | Recognise where specialist geotechnical input is required | White | declared aware | DECLARED | Med · BS EN 1997 (EC7) |
| D06.04.A2 #V | Awareness | Recognise a Gateway trigger and the duty to notify | White | declared aware | DECLARED | Med · BSA 2022; HRB Gateways SI |